| Our Transformer has Successfully passed |
Our Servo Voltage Stabilizer has successfully passed |
|
Short Circuit tests |
|
Harmonic Measurement in no load voltage & current of the transformer |
|
Temperature rise Test |
|
Measurement of Zero sequence Impedance & Lighting Impulse Voltage withstand Tests as per IS |
|
|
Physical Examination Test |
|
Insulation Resistance Test |
|
High Voltage Test |
|
Provision for Earthing |
|
Leakage Current Test |
|
Output Voltage Test |
|
No-Load Current & Load Losses Test |
|
Load Loss & Efficiency Test |
|
Induced Voltage Test |
|
Continues Operation Test |
|
Temperature rise Test |
|
Test of Rate of Correction & |
|
Locked Rotor Test for Servo motor |
|
| Through Electrical Research Development Association (ERDA), Vadodara on dtd: 26/03/2008. |
Through Electrical Research Development Association (ERDA), Vadodara on dtd: 30/04/2005. |